en | fr | de | it | es | pt | ru
blog.niot.net
Toledo Jeep workers to get four more weeks of "vacation"

Employees at Jeep's factory in Toledo, Ohio reported back to work this week after two months of mandatory downtime. The good news is that they still have their jobs; the bad news is that they've been told to expect another four weeks off before the end of the year. This time, however, the shutdowns will be scheduled in week-long intervals instead of covering an entire four-week period. The slowdown of SUV sales has been widely covered and the Jeep brand has not been immune, including its bread-and-butter Wrangler model that had proven extremely popular a short while back when the first-ever four-door version was unveiled. Of course, back then gas was below $3 a gallon. Besides the Wrangler, Jeep also makes the Liberty and Dodge Nitro at the Toledo plant.
posted : 9/13/2008 @5:49:40 AM
Chrysler considering four-day work week at Toledo Jeep plant

Jeep sales are down. They're way down, in fact, posting a 44-percent drop in their daily sales rate last month. Though the larger 'utes are really dragging down sales, even the once-untouchable Wranger has been feeling the sting of escalating fuel prices, as its blocky shape and 3.8-liter V6 engine conspire to deliver awful fuel mileage. Also selling rather slowly are the Jeep Liberty and Dodge Nitro, which are assembled at the same plant in Northwest-Ohio. In an effort to save costs, Chrysler officials are considering reducing the work-week at the Toledo plant from the normal five days down to four and allowing its workers to stay on for ten-hour shifts. While that total still equals the forty-hours from a five-day, eight-hour per day work-week, Chrysler believes it can save on energy and fuel costs by shuttering the plant for an extra day.
posted : 8/9/2008 @4:34:15 PM
< back ( 1 ) next >
:: new posts
:: popular posts
copyright 2007 (C) - powered by ceastudio